A new road reached the fish market last year, yet Dev’s fish still lose value on the way. Why didn’t the road fix it?

Logistics cost is everything spent moving and storing goods: freight, handling, waiting, warehousing, losses and paperwork. Much of it sits at the joins: switching between road, rail and water, waiting at terminals, and projects built out of step by different departments. Rail and water are cheaper per tonne-km but cost more to load and switch, so they win only on long hauls with smooth handovers. PM Gati Shakti (13 October 2021) puts ministries’ and states’ plans on one GIS map so projects are planned together; the National Logistics Policy (17 September 2022) aims to cut costs and measure them. A DPIIT–NCAER study put logistics costs at about 7.97% of GDP in 2023–24 (September 2025, as reported), far below the long-quoted 13–14%. The roads, rail and ports themselves are in Earth Lab’s transport course.

Logistics cost
About 7.97% of GDP (₹24.01 lakh crore), 2023–24; 8.84% in 2022–23 (as reported).
Old claim
13–14% of GDP, never properly measured.
Modal mix
Rail cheaper per tonne-km, dearer to load; National Rail Plan aims at 45% rail share by 2030 (as reported).
PM Gati Shakti
13 October 2021; GIS master plan; Network Planning Group.
NLP
17 September 2022; ULIP, LEADS; top 25 in the LPI by 2030.
LPI
India 38 of 139 (World Bank, 2023).

Remember: The cost of moving goods sits at the joins; plan them together, then measure the whole bill.